Sunday, September 7, 2008

MSB time

With some pointers and assistance, Drew launched into wiring up the Main Switch Board. Not something he's been exposed yet, so this was a great learning experience (a positive one, as opposed to the tiling frustration). A neat freak and detail oriented in this regard, Drew ensured the MSB was perfect!

There's some more RCD, RCBOs and security PIRs and other interesting acronyms to be sorted out, as well as the intermediate switching plates to be sourced and fitted, but the majority of the electricals is now done. Later this week some testing will be done, with Adam, and then the changeover between the downstairs MSB and the upstairs MSB. Closer!